The MTBF prediction is calculated using component and subassembly random failure rates. The calculation is based on the Telcordia SR-332 Issue 2, Method I, Case 3.

Product Part Number MTBF
HD-2 PKG-RM-HD2-GROUP, DEV-RM-HD2-SA 61,115 hours
HD-3 PKG-RM-HD3-NTPM-GROUP, PKG-RM-HD3-GROUP, DEV-RM-HD3-SA, DEV-RM-HD3-NTPM-SA 179,500 hours
HD-40B DEV-RM-HD40-B-SA-0A 66,640 hours
HD-40C DEV-RM-HD40-C-SA-0A 61,825 hours
HD-100D DEV-RM-HD100-D9020-SA-0A & DEV-RM-HD100-D-NTPM-SA-0A 75,400 hours
HD-230 DEV-RM-HD230-NTPM-SA-0A & DEV-RM-HD230-SA-0A 80,520 hours
VidyoGateway DEV-SRV-GW-N2-0B 29,900 hours
VidyoGateway XL DEV-SRV-GW-XL-N3-0A 121,400 hours
VidyoOne DEV-SRV-ONE-N2-0B 29,900 hours
VidyoPanorama 600 DEV-SRV-PAN600-N2-0A 109,186 hours
VidyoPortal DEV-SRV-PT-N2-0B 29,900 hours
VidyoPortal XL DEV-SRV-PT-XL-N3-0A 116,700 hours
VidyoReplay DEV-SRV-REP-N3-0A 116,700 hours
VidyoRouter DEV-SRV-RTR-N2-0B 29,900 hours
VidyoRouter XL DEV-SRV-RTR-XL-N3-0A 103,600 hours
Was this article helpful?
0 out of 0 found this helpful

0 Comments

Follow
Please sign in to leave a comment.